KCG600E-POWER
600 kVA / 522 kWh hybrid power for full-shift construction
The KCG600E-POWER is designed for sites that need sustained high power with significant low-load periods — tower crane operations, heavy construction plant, and main-stage events where the genset runs all day but load varies from 20% to 100%.
Designed and built for the field
IP54 weatherproof enclosure, single-point lift, integrated diesel and battery in one machine.
One machine. Two energy sources. One workflow.
Single-point lift
Certified lifting eye on the centre of gravity. One crane hook, no rigging crew. The KCG600E moves like a normal genset — onto a low-loader, off again, and into position.
One HMI, one workflow
Diesel, battery, EMS — all on one screen. Branch operators trained on diesel can run the KCG600E in one day. No multi-vendor interface risk.
Integrated topology
Diesel module and LFP battery share one AC bus. The EMS decides when each runs based on load. Not bolted-on — engineered.
Sized for the fleet
Standard transport footprint. IP54 weatherproof. CE / Stage V compliant. Drop-in replacement for an existing diesel genset.
Technical specifications
Detailed datasheet available on request.
| Apparent power | 600 kVA |
| Battery capacity | 522 kWh LFP |
| Battery chemistry | Lithium Iron Phosphate (LFP) |
| Weight | 4.5 t |
| Voltage range | 320–460 Vac |
| Frequency | 50/60 Hz |
| Ingress protection | IP54 |
| Engine emissions | Stage V |
| Communication | RS485, Ethernet, 4G opt. |
| Noise level | On request |
| Deployment | Single-point lift |
| Control | One HMI, in-house EMS |
3D engineering reference
CAD drawings, lift plans and electrical schematics available under NDA for fleet integration teams.
When to choose KCG600E-POWER
Tower crane operations
High peak demand with extended low-load periods between lifts. Battery absorbs the valleys, diesel supports the peaks.
Heavy construction plant
Full-shift power for large sites. Night-time security and lighting runs on battery alone.
Main-stage events
High power for AV and lighting with battery priority during quiet changeovers.
Construction / Tower Crane
How the KCG600E connects to a tower crane site, with site office and lighting loads.
Need help sizing the KCG600E for your project?
Share your load profile, site duration and operating hours. We will build a TCO model.